Case - Oslo Central Station

1) The train control system tells us that a train has left a track segment.

2) We calculate that the train has left a station with a 10 min. delay.

3) The platform signs must then be updated with the next train.

4) The train must be removed from the monitors and boards showing departures.

5) The train must still be present on the arrival monitors for another 10 min.

6) The delay must be calculated for subsequent stations.

7) The delay must be shown on all relevant signs, monitors and boards.

Case figur
LPT-IT ApS Stormgade 9 DK-7100 Vejle E-mail: lpt@lpt.dk +45 7674 0484
Copyright: LPT Industriel Software Design: Courage Design